機電一體化個人英文簡歷範文

name: mr. long
sex: male
date of birth: may 1987
marital status: unmarried
national: han
account: henan zhengzhou
political landscape: members
specialties: mechanical and electrical integration
graduation time: june XX
graduate institutions: henan university of technology
work experience: internship / year
education: tertiary


job intentions

work type: full-time
nature of units: open
expectations of the industry: machine building, electrical and mechanical equipment, heavy industry, production, manufacture, processing, fabricated metal products industry, trade, import and export of instruments, meters, industrial automation
expectations of job: mechanical drawing, and mechanical and electrical engineers, sales representatives, sales assistants, sawing / lathe / grinding / milling machine / planer
working location: hangzhou, ningbo, jiaxing, shaoxing, taizhou
expectations of a monthly salary: 1000-XX


education

from september XX to june XX studying at the vocational technical school in henan province steel smelting professional qualifications
from march XX to january XX a student at xi'an university of architecture and technology college of further education college degree metallurgical engineering
from september XX to june XX studying at the henan university of technology post-secondary professional education mechatronics
since the september XX self-zhengzhou bachelor's degree in logistics management professionals
in october XX in henan province was the second industrial school scholarships
march XX technical school in henan province was the second scholarship
june XX technical school in henan province was rated "outstanding college graduates in henan province"
in september XX in henan university of technology was third-class scholarship
in september XX in henan university of technology was third-class scholarship



training experience

XX-10-10 ~ XX-12-10 in henan university of technology certification training cad engineers and pass the exam to obtain a higher certificate in cad.


work experience

from september XX to december XX in henan jiyuan iron & steel co. blast furnace smelting converter section foundry workshop, such as job training
from october XX to may XX metalworking practice between the schools, manual drawing and cad training, training on regular motor milling machine, electronic electrician training, plc training, microcontroller training, training fluid pressure, a number of training vehicle control milling machine
XX年7 to XX in jiangmen city, 9 hardware manufacturing co., ltd.裕安twist screw dental work done
from september XX to october XX delayed the group in china lathe milling drilling machine, such as job training
from january XX to march XX in dongguan city, trade and international logistics co., ltd. to do the storage administrator
from july XX to september XX in dongguan city, the united states when sheet metal workers factory gong to do


professional skills

would plc, microcontroller, operating cnc machine tools, skilled operation to word, excel and other office software, have some writing skills and organizational management capabilities.