name: mr. gender: male
wedlock: single nation: han
residence: guangdong-qingyuan age: 28
location: guangdong-dongguan height: 173cm
target locations: guangdong
target positions: industry/factories-industrial engineer
industry/factories-production management clerk
industry/factories-technic engineer
target jobs: industrial engineer、 lean engineer
education
xx-09 ~ xx-07 guangdong university of technology industral engineering bachelor degree
training
xx-12 ~ xx-12 guopei certificate internal quality auditor training &qualification
company name (xx-07 ~ present)
company type: private enterprise company category: electrical,micro-electronics
job title: industrial engineer positions: industrial engineer
job description: 1.npi: process planning, fixture and equipment planning, prepare process checklist
2.standard time and capacity evaluation, line balance and prepare sop for new products
3.maintain the usage of the consumptive material, standard time and capacity
4.perform line balance and improve process to rise capacity
5.design and improve the tools and fixture in the work site
6.monitor the efficiency of the production line, analyze these reasons manpower, machine, material , environment, method, push the relative dept to solve issues
7.kaizen project planning and push: auto-machine introduce, production way optimize, manpower and material saving, etc
career highlight:
1.auto-welding machine introduce: welding process operator saving(16 operators-12 operators=4 operators), line balance rate upgrade from 83% to 91%, solder wire saving 3.2grams, cost of solder wire saving 1.6 yuan rmb for each pcba.
2.auto-packaging production line planning and implement: master carton packaging operator saving, every production line deploy 2 packaging operators for 8 lines, after introduce the new equipment it takes only 5 operator to seal the master carton
3.rear cabinet pre-process and final assembly combine: manpower saving include 1 conveyer, 1 visual inspector, 1 loading operator and 1unloading operator(total 4 operators), and saving the usage of bubble bag and partition board
4.decorative plate incoming package improvement: change the package material and simplify package way to reduce pack cost(from 0.13yuan to 0.09yuan rmb) and cut down unpack operation time( saving 12 seconds)
5.cooperate with rd to change pcba process from dispensing process to solder paste process, in order to cut down welding failure rate after wave-soldering. in this case charge of pcba fixture design and improvement evaluation(repairing welding time 140sec reduce to 70sec,4 repair welding operators cut down to 2 operators)
6.according to the small order quantity of the product, study the less humanizing process for small products to reduce the change over loss time(38 operators*30minute-
20 operator*40minutes=340minutes) and improve 8% of the motion effective rate
reason for leaving: not very good economic benifit of the company,little chance to promote both in position and welfare
company name (xx-07 ~ xx-06)