外貿契約中英文

賣方於檢附海運提單及相關檔案經由押匯行向開狀銀行取得應收的押匯款後,貨物所有權同時歸買方所擁有。若開狀銀行或押匯行以不合理之異議作為拒付或者有延遲付款情形產生時,賣方有完全的權利以其單方所認定的合適方法對貨物做任何的處理。

22. inspection檢測:

draft survey weight at loading port certified by sgs (pt.sucofindo) at the loading port shall be final subject to 0.5% franchise against b/l weight.

in case, there is a difference in weight compared to b/l weight exceeding 0.5%, buyer o r seller will compensate the amount in excess o r shortage (including 0.5%). seller may appoint a surveyor at discharging port at the seller’s expense. inspection certificates issued by ciq at the discharging port shall be deemed as final. all compensation amounts in excess o r shortage between the buyer a nd the seller will be paid within 7 (seven) banking days.

在裝運港由sgs(pt.sucofindo)檢測的重量與提單重量相差0.5%以內應為最終結算標準。如果與提單所示重量相差超過0.5%,買方或賣方應補償超出或短缺部分(包括0.5%)。

賣方可以自費指定卸貨港檢測員。在卸貨港由 ciq頒發的檢測證書應為最終結果。

買賣雙方之間對超出或短缺部分的差額之補償應在7個銀行工作日內付清。