ppenalties and/or compensations which party b shall pay in accordance with the
stipulations ofthe contract.
articie 5 technical service and training
5.1 technicgl service
5.1. l during the validity period of the contract, party b shall send a specialist to
partya`s factory to explain the drawings and technical documents and to provide teehnical
servise indesigning.manufacturing, adjustment,inspection and maintenance of the
contracted pro-duet so to eheble party a to use, as fast as possible, home materials
and raw components without affeeting the properties of the products so manufactured.
5.1.2 party b shall twice send it’s specialists to party a’s factory to provlde
technicalservice for a total of 30 working days man.
5.l.3 the first technical service sha1l start in the sixth month after the contrayt
comesinto effect. party b shall send a specialist to party a’s factory to provide
technical service for 12 working days/man.
5.1.4 the second technical service shall start during the verification of the
cortractedproduets.parth b shall send a specialist to party a’s factory to provide
technical servicefor18 working days/man.
5.1.5 party b shall, for its specialists, bear their travelling expensee. partha
shall be responsible for boarding and lodging and affording the means of conveyance from
the lodgingplace to the factoty.
5.2 technical training
5.2 1 party b shall train party a’s technical personnel so as to enable them to
masterparty b’s design, performance test and technology in machining, erection and