65.1任何責任,不論屬於賠償或其他,也不論其是有關或涉及工程(以下提及的任何特定風險發生前,已按本契約第39條宣布為不適用的工程除外)、業主或第三當事人的財產的毀壞或損壞,或有關或涉及人員傷亡,只要是因以下所規定的特定風險導致,承包人慨不負責。業主必須保證承包人不受上述情況以及由此所引起的任何索賠、訴訟、損害賠償金、訴訟費、開支和費用的損害。

(2)if the works or any materials on or near in transit to the site,or any other property of the

contractor used or intended to be used for the purposes of the works,shall sustain destruction or damage by reason of any of the said special risks the contractor shall be entitled to payment for:

65.2如工程或任何在工地、或從附近運往工地的材料,或承包人其他用於或旨在用於工地的任何財產因上述特定風險受到毀壞或損壞,承包人有權得到以下償付:

(a)any permanent work and for any materials so destroyed or damaged,

因此而被毀壞或損壞的任何永久性工程或材料,

and,so far as may be required by the engineer,or as may be necessary for the completion of the works,on the basis of cost plus such profit as the engineer may certify to be reasonable;

以及,只要工程師要求,或工程完工所必需,按成本費加上工程師證明合理的利潤為基準支付;

(b)replacing or making good any such destruction or damage to the works;

恢復或補償工程被如此毀壞或損壞的部分;

(c)replacing or making good such materials or other property of the contractor used. intended to be used for the purposes of the works. 

恢復或補償承包人用於或旨在於工程的此種材料或其他財產。

(3)destruction,damage,injury or loss of life caused by the explosion or impact whenever and wherever occurring of any mine,bomb,shell,grenade,or other projectile,missile, munitions,or explosive of war,shall be deemed to be a consequence of the said special risks.

65.3因地雷、炸彈、炮彈、手榴彈、或其他射彈、飛彈、彈藥、或軍用炸藥的爆炸或衝擊(不論時間和地點)所導致的毀壞、損害、受傷或死亡應被視為是上述特定風險的結果。

(4)the employer shall repay to the contractor any increased cost of or incidental to the execution of the works,other than such as may be attributable to the cost of reconstructing work condemned under the provisions of clause 39 hereof,prior to the occurrence of any special risk,  which is howsoever attributable to or consequent on or the result of or in any way whatsoever connected with the said special risks,subject however to the provisions in this clause hereinafter contained in regard to outbreak of war,but the contractor shall as soon as any such increase of cost shall come to his knowledge forthwith notify the engineer thereof in writing.